· Your location: Home ->Products -> PP-R PIPES & FITINGS -> PP-R PIPES
Installation Process 1-3
Installation Process:
1.Cut the pipe vertically with a pipe cutter.Take care that the pipe axis is free from burrs or cuttings debris and remove where necessary.

2.Make a mark at the depth of pipe insertion(equal to slip-in depth of connector).

3. Clean the sockets and the spigot with cleaning clothes.


Copyright by © Simbaland manufacturers limited