· Your location: Home ->Products -> PP-R PIPES & FITINGS -> PP-R PIPES
Installation Process 4-6
4.Heat up the entire insertion part on the welding machine, including the pipe and fitting.

5.After the welding machine reaches the necessary operating temperature,  push the end of the pipe and fittings, without
turning, stably and evenly to form a solid and perfect joint.

6.Remain holding the pipe and fitting until the melting  part cools.

Copyright by © Simbaland manufacturers limited